新闻资讯

新闻资讯

current position: Home > News Center > Industry Trends

Introducing all aspects of servicing concrete batching plant systems

2023-01-07 00:00:00
times

As we all know, concrete mixers are used in the open air and are exposed to wind, sun and rain all year round. If regular maintenance and upkeep can extend the life of your equipment, let us cover all aspects of servicing your concrete batching plant system.

The concrete mixer completely cleaned the inside and outside of the mixing barrel, drained the door, etc., and rinsed it with water. Adhesive that has not been properly cleaned should be removed regularly. Tighten the mixing blades once a week to prevent them from falling and causing accidents.


Concrete Mixing Station


Concrete Mixer Check the shaft end sealing cavity, the inlet and outlet of the distributor, whether the sealing line is smooth, whether it is filled with grease, and whether each lubrication point and gearbox have enough grease. Observe whether the grease in the oil storage tank of each grade electric lubrication pump is used up. It should be filled up in time after use, and oil-free operation is not allowed.

Why are blenders inefficient?

1 Preparation time is longer than mixing and discharging time. Since the preparation of various raw materials needs to be completed after the preparation is completed, in this case, there is a lot of idle time in the whole process, and this time can only wait for the preparation, which greatly reduces the work efficiency of each work process. unit time. The corresponding workload cannot be completed.

2 preparation time is less than or equal to the sum of the two. The amount of calculation of work efficiency in the concrete production process is relatively large, that is to say, if the total production time is too long, it will destroy the entire concrete production balance and reduce work efficiency.

Often, too much time is wasted in the preparation phase, which means that the weighing or shipping process of raw materials is too long. Generally, materials such as gravel and pebbles are difficult to transport to the mixer due to their special characteristics, so it takes a long time. During this time, the cement and curing agent and liquid are weighed and the transportation can be terminated. Therefore, whether the gravel and pebbles can be weighed and transported according to the standard time directly determines the efficiency of the concrete batching plant. In practice, we can control the speed of the weighing tools so that the transportation equipment can greatly increase the transportation workload, which is very beneficial to reducing the sand and gravel transportation time. These are the reasons why concrete mixers are inefficient.

Concrete mixers should provide cast-in-place concrete to the construction site in the form of centralized ready-mixing and long-distance transportation. It is a high-tech building material product that combines modern concrete with modern construction technology. Modern buildings, highways, railways, bridges, airports, etc. are all inseparable from concrete pouring, so concrete mixing stations have become a popular product in these industries.

Related news

  • Menu

综合管廊成套装备生产厂家

Links:
Copyright © Jiangsu Zhongyi Building Materials Machinery Co., Ltd All rights reserved record number:Su ICP No. 18031077-1 Mainly engaged in, Welcome to inquire!
Article | Site map | RSS | XML Technical Support: Yicheng Network Disclaimers
#

x